01 / Define the brief
Record the building, project stage, energy recipient and decision-maker. Output: a brief with the objective, project boundary and information still needed.
Project pathway
Each stage needs a clear output and an agreed scope. Appointment, design responsibility and delivery arrangements are confirmed for the project—not implied by a concept.
Four stages

Record the building, project stage, energy recipient and decision-maker. Output: a brief with the objective, project boundary and information still needed.

Compare candidate surfaces with shading, energy demand and site constraints. Output: a shortlist of options, their assumptions and the studies needed to choose between them.

Bring product evidence, building interfaces and electrical design together. Output: a coordinated scope and a register of documents, responsibilities and unresolved items.

Agree staging, commissioning, handover and replacement access. Output: a delivery and support plan with named responsibilities, exclusions and outstanding approvals.
Before committing
Record what is supplied, designed, installed and supported—and by whom.
Confirm product documents, design checks, approvals and responsibilities appropriate to the project.
Agree testing, records, monitoring access, warranty contacts and maintenance obligations.