Resources

Technical checks.
Clearer project decisions.

Three short paths: specify the system, verify the rules and prepare the brief.

01 / Technical

Select with the right evidence.

Use the proposed SOLNEX product reference consistently. A coordinated technical pack starts here; open the checklist when you are ready for the detail.

BIPV Glass Specification ChecklistFour checks before a glass option enters the specification.

Application

Identify the building element, vision requirements, orientation, shading and intended glass assembly.

Product information

Request the proposed SOLNEX product reference, glass make-up, dimensions, weight, finish, optical and thermal data, and electrical characteristics with test conditions. Keep the product reference consistent across the proposal and technical records.

Evidence

Review the selected product and assembly against applicable building and electrical requirements. Record documents, their scope, issuer and revision; match them to the proposed model and assembly. A product report is not approval of the complete building design.

Interfaces & support

Identify connections, cable routes, inverter space, replacement method and warranty responsibilities. Confirm actual product and sample availability before specification.

02 / Policy & incentives

Check the current rules.

Reviewed · Australian official sources

Starting points only. Rules and funding rounds can change; verify the official source before making a commitment.

CER / Renewable Energy Target

PV and battery eligibility

Check the scheme pathway before including incentives in a proposal.

Check CER eligibility

CBD / Office disclosure

Selling or leasing an office?

Check whether Commercial Building Disclosure applies before marketing the space.

Check affected buildings

03 / Project process

Prepare a useful brief.

Start with the site, available information and a defined decision. These checklists help the owner, building team and appointed specialists agree what to assess.

Office Building Energy Assessment ChecklistMetering, operating data and site constraints.

Energy boundary

Identify base-building and tenant meters, loads, ownership and who receives the energy benefit.

Operating evidence

Gather available interval data, tariffs, operating hours and planned changes to plant or occupancy.

Physical constraints

Record roof condition, plant and access zones, structure, shading, switchboards and connection requirements.

Decision record

Compare scoped options with explicit assumptions. Record missing data, approvals and the next study required.

Shopping Centre Solar Opportunity GuideRoof, parking and glazing opportunities.

Map the zones

Separate roof areas, carparks, entrance structures and possible glazing works. Identify pedestrian and vehicle requirements.

Map the energy

Establish common versus tenant supply, interval loads, tariffs and where proposed generation or storage would connect.

Protect trading

Agree access, temporary works, construction staging, security and outage constraints with site management.

Compare fairly

Use common assumptions for alternatives. Include structure, electrical upgrades, operating disruption, service access and lifecycle costs.

BIPV Design & Delivery ResponsibilitiesDesign, supply, installation and support responsibilities.

Owner / developer

Define the outcome, approve the scope and appoint the responsible design and delivery parties.

Façade and structural designers

Resolve the building assembly, support, weathering, applicable glass performance and replacement access.

Electrical designer and delivery team

Resolve the electrical design, connection, protection, access, testing and handover for the agreed scope.

Product supplier and coordinator

Provide traceable product information and agreed supply support. Assign responsibility for interface coordination explicitly; confirm which responsibilities sit with SOLNEX, the supplier and appointed consultants.

Let’s consider your project.

Discuss Your Project